
Factory & quality
Capacity you can see.
Quality you can question.
Look beyond a factory photograph. Ask how your drawings, materials, inspections and handover records will be agreed for the work.

Make a factory review useful.
The company presentation shows a manufacturing base in Jining and examples of industrial and nonstandard steelwork. Confirm the equipment and available production arrangements against your particular component package.
待补: verified capacity, equipment list, current staffing and dated factory footage. The Demo’s third-party video has not been carried into this site.
Agree the evidence before production.
| Materials | Required grades, material certificates and traceability approach. |
| Drawing control | Confirmed revisions, component marks and agreed technical clarifications. |
| Fabrication inspection | Required checks, acceptance basis and any specified third-party inspection. |
| Surface treatment | Preparation, coating system and inspection evidence specified for the order. |
| Dispatch | Component identification, packing lists and handover documents. |
The exact process and record samples need company confirmation. This checklist does not claim certification to a particular fabrication standard.
ISO application in progress.
ISO is currently described as an application in progress. No ISO certification is claimed. Specific standard, approval and certificate details are 待补.
Have drawings or a project brief?
Share your project location, requirements and current drawings so the team can clarify the next step and the supply scope.